How To Move Task Within An Existing Task List In Project 2010
This article explains how to move task within an existing task list in Project 2010.
Introduction
Process used for move a task within an existing list in Project 2010 is given below.
Step 1
Select an entire task with a click on its row heading.
Step 2
Drag the task to its desired position indicated by the line cursor.
Step 3
Then drop the task at his new position.